DIVE HAZARD ANALYSIS
Feature: Clear Springs Foods
Dive Location: Box Canyon Farm
Date: January 29, 1999 (Hazard Analysis)
Date: January 30, 1999 (Examination)
Dive Purpose: Inspect three pipelines crossing the Snake River at Box Canyon
Dive Area: Lake River X Ocean Dam Canal Other
Previous Diving in Area: Since 1982
Access: Walk down river bank
Exit: Walk out from river bank
Depth Actual: 10 ft.
Altitude: 4,000 elev. +/-
Depth Corrected: + 35 ft.
Non Decompression Limit: No Limit
Temperature: 32 degrees F +/-
Maximum BT: 30 min.
Bottom Condition: River bottom
Entanglement: Fishing line
Weather: Forecast is cold and windy
Currents: Minimal to moderate
Vertical Ascent: Yes
Visibility Water: 1 inch to 3.5 feet
Lights Required: Yes
Video Recommended: No
Camera Recommended: Yes - Photos for dive report
Surface Support: Safety diver, boat operator and crew, Clear Springs personnel
Special Equipment: Measuring tape
Team Coordination: See notes below
Dive Plan: See notes below
Emergency Equipment: Oxygen and First Aid equipment, Call DAN (919) 684-8111
Hospital: Magic Valley Regional Hospital, 208-737-2500
Physician: Dr. Higginbotham 208-376-2522
Recompression Chamber: Wells Dam 509-923-2225 or 2226
Ambulance: 911 (Buhl, Bliss, Haggerman)
Telephone: Cellular Phone
Radio: None, telephone in office
Diver's Experience: Experienced through Journeyman
Conditions: As described above.
Satisfactory: Yes
Unsatisfactory:
Signed: Dive Master Date Team Leader Date Team Member Date
Additional Remarks:
Team Coordination: Carry equipment to waters edge and enter water at river bank. Two divers down. Safety diver in the boat with one boat operator and the other as crew. The diver will direct any boat up operation by the operator and crew.
Dive Plan: Two divers will inspect one pipe all across the bottom. After inspection of the first pipe the two divers will surface and explain to the boat operator and crew what was found. The divers will then inspect the second pipe and surface on the original side. Once again explaining what was found. The third pipe will be inspected and the divers will surface and report the findings. At this time the camera will be retrieved from the boat. The next crossing will be used to photograph a representative section of pipe.
Inspection: Check the welded ( 4 times) (20 foot sections of pipe) joints for integrity. Check pipe for rust spots and nodules. Check for soundness of the 4 foot diameter steel pipes which are ½ inch thick steel. Two of the pipes (purchased from a Canadian source) were place approximately 26 years prior. They parallel each other and are approximately three feet apart. The third pipe is the same dimensions and at a bit of an angle. Clear Springs Food personnel from Box Canyon facility will be present to assist. Photograph representative pipe sections.
Participating Divers: Phillip E. Graf, Dennis Hawkins and Clayton Spaudling